![]() |
|||
|
|
![]()
Below are pre-cruise projects, for both deck and engine. The project is designed to have all 4/C spend time on the ship learning the different engine room systems, deck layouts, and general information about the T.S. STATE OF MAINE. It is essential to complete this project to the best of your ability in order to make the most of Cruise '07. Please keep due dates in mind and remember that plagiarism will not be tolerated (refer to student handbook for MMA Academic Honesty Policy).
Deck Pre-Cruise Drawings (MS Word)-* Check Due Dates*
Deck Pre-Cruise Project (MS Word) - Pre-Cruise Project document required for ALL Cruising 4/C
**Due Dates Are Included in the Project**
Tools Required for 4/C Maintenance (MS Word) *A comprehensive list of all tool requirements for all students enrolled in a maintenance course at MMA. Includes 4/C, 3/C, and 2/C. These tools make an excellent birthday, Christmas, or holiday gift for students. (Required Spring 2007) |
|
|
|
|
|||